
China manufacturing unit YC series electric motor
Software:
YC Motors are ideal for driving modest devices and water pumps, particularly for families or workshops exactly where only one-period electric powered provide is CZPT.
Bordo:
1. Higher torque
2. Steady running
three. Lower sounds
4. Increased overload performance
Operating Problems:
one. Defense class: IP44/fifty four/55
two. Insulation class: B/F
three. Rated voltage: 220V
4. Cooling variety: IC0141
5. Responsibility: Steady(S1)
six. Rated frequency: 50Hz/60Hz
Notice:
If you have any specific requirements, please make contact with us.
| Complex Information | ||||||||||
| Tipo | Produzione | Voltage (V) | Existing (A) | Speed (r. p. m) | Eff (%) | Electrical power factor | CZPTt torque | CZPTt Recent | Max. torque | |
| HP | kW | coppia nominale | Valutare l'attuale | coppia nominale | ||||||
| YC80A-2 | .5 | .37 | 220 | 3.seven | 2880 | 62 | .73 | 3 | 6.5 | 1.8 |
| YC80B-two | .75 | .cinquantacinque | 220 | five.three | 2880 | sessantacinque | settantatré | tre | 6.5 | 1.otto |
| YC80C-two | 1 | settantacinque | 220 | six.7 | 2880 | 68 | settantacinque | 3 | sei.5 | 1.8 |
| YC90S-2 | 1.5 | 1.1 | 220 | 9.1 | 2880 | settantuno | .77 | 2.4 | seven | 1.otto |
| YC90L-2 | due | uno,5 | 220 | 12.one | 2900 | settantadue | .seventy eight | due.8 | seven | uno.8 |
| YC100L-2 | tre | 2.due | 220 | 17.1 | 2900 | 74 | settantanove | due,5 | 7 | 1.8 |
| YC112M-2 | 4 | tre | 220 | 21.4 | 2900 | 76 | .eighty two | due.2 | 7 | 1.otto |
| YC80A-four | .33 | venticinque | 220 | 3.4 | 1450 | cinquantasei | .6 | 3 | 6 | uno.8 |
| YC80B-quattro | .5 | .37 | 220 | 4.5 | 1450 | sessanta | .62 | 3 | sei | 1.otto |
| YC80C-quattro | .75 | .55 | 220 | sei | 1450 | 64 | sessantacinque | tre | 6 | uno.8 |
| YC90S-4 | 1 | settantacinque | 220 | 7.seven | 1450 | sixty seven | .sixty six | due,5 | sei.5 | 1.otto |
| YC90L-four | uno,5 | uno.uno | 220 | 10.5 | 1450 | 70 | sessantotto | due,5 | 6,5 | uno.8 |
| YC100L-quattro | due | 1.5 | 220 | 13.5 | 1450 | settantadue | .7 | due,5 | 6.5 | uno.otto |
| YC112M-quattro | 3 | 2.due | 220 | 19.3 | 1450 | 72 | .seventy two | due.2 | sei,5 | 1.otto |
| YC132SA-four | quattro | 3 | 220 | twenty five.two | 1450 | 74 | .73 | due.1 | 6,5 | 1.8 |
| YC132SB-four | 5 | tre.sette | 220 | trenta | 1450 | 75 | .74 | 2.uno | sei,5 | 1.8 |
| YC132M1-four | 7,5 | 5.5 | 220 | 32,5 | 1450 | eighty one | .95 | 2.uno | sei.5 | uno.8 |
| YC132M2-4 | 10 | 7,5 | 220 | forty three.three | 1450 | 83 | novantacinque | due.1 | sei.5 | 1.8 |
SPARE Components:
PACKING Techniques
FAQ
D: Fornite servizi OEM?
A: Sure
Q: What is your payment time period?
A: thirty% T/T in advance, 70% stability when receiving B/L duplicate. Or irrevocable L/C.
D: Quali sono i tempi di consegna?
A: About 30 times after receiving deposit or first L/C.
Q: What certifiicates do you have?
A: We have CE, ISO. And we can use
