
RV collection Characteristics
- RV – Measurements:030-040-050-063-075-a hundred and five-one hundred ten-a hundred thirty-a hundred and fifty
- Input Choices: with input shaft, With Square flange,With Input Flange
- Input Electricity .06 to 11 kW
- RV-Dimension from 030 to 105 in die-solid aluminium alloy budy and in excess of one hundred ten in cast iron
- Ratios in between five and a hundred
- Max torque 1550 N.m and admissible output radial loads max 8771 N
- Aluminium models are provided comprehensive with synthetic oil and permit for common mounting positions, with no need to have to modify lubricant amount
- Worm wheel: Copper (KK Cu).
- Loading ability in accordance with: ISO 9001:2015/GB/T 19001-2016
- Measurement 030 and in excess of are painted with RAL 5571 blue
- Worm equipment reducers are CZPT with diffferent combinations: NMRV+NMRV, NMRVpower+NMRV, JWB+NMRV
- NMRV, NRV+VS,NMRV+AS,NMRV+VS,NMRV+F
- Possibilities: torque arm, output flange, viton oil seals, lower/higher temperature oil, filling/drain/breather/stage plug,Small hole
Standard versions can be used to a vast selection of energy reduction ratios from 5 to 1000.
Warranty: One year from day of supply.
| WORM GEARBOX | |||||
| SNW SERIES | Output Speed Selection: | ||||
| Είδος | Outdated Variety | Output Torque | Output Shaft Dia. | 14rpm-280rpm | |
| SNW030 | RV030 | 21N.m | φ14 | Applicable Motor Energy: | |
| SNW040 | RV040 | 45N.m | φ19 | .06kW-11kW | |
| SNW050 | RV050 | 84N.m | φ25 | Enter Options1: | |
| SNW063 | RV063 | 160N.m | φ25 | With Inline AC Motor | |
| SNW075 | RV075 | 230N.m | φ28 | Input Options2: | |
| SNW090 | RV090 | 410N.m | φ35 | With Square flange | |
| SNW105 | RV105 | 630N.m | φ42 | Input Options3: | |
| SNW110 | RV110 | 725N.m | φ42 | With Input Shaft | |
| SNW130 | RV130 | 1050N.m | φ45 | Enter Options4: | |
| SNW150 | RV150 | 1550N.m | φ50 | With Enter Flange |
CZPTshine Push
ZheJiang CZPTshine Push Co.,Ltd,the predecessor was a state-owned navy mould enterprise, was set up in 1965. CZPTshine specializes in the comprehensive power transmission answer for substantial-end gear producing industries dependent on the goal of “System Item, Application Style and Specialist Services”.
CZPTshine have a powerful technical pressure with in excess of 350 personnel at present, including above 30 engineering professionals, 30 top quality inspectors, masking an region of 80000 sq. meters and types of innovative processing devices and screening equipments. We have a excellent foundation for the market software development and support of substantial-conclude velocity reducers & variators proudly owning to the provincial engineering engineering investigation heart,the lab of equipment speed reducers, and the foundation of modern day R&D.
Our Group
Good quality Management
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value
3. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective measures
to prevent recurrence.
four. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.
5. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of
customer expectations and needs.
six. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the product
is a product inspection to determine the qualified products.
Συσκευασία
Προμήθεια
