Transmission Conveyor Mo shop torcy supplier cle/Timing /Bicycle Link Chain Roller Chain /Hollow Chain/ Industrial Steel Pintle Chain

Deskripsi Produk

DAFTAR PRODUK KAMI:
A and B series single/double/triple standard roller chain and no-standard roller chain

DIN/ISO ANSI Melempar Rol Lebar Pin Pin Lnner Piring Terakhir Rata-rata berat
KIN/ISO ANSL     di antara diameter panjang piring tebal tarik tarik per
Rantai Rantai     pelat bagian dalam       kedalaman -ness kekuatan kekuatan meter
TIDAK. TIDAK. P d1 b1 d2 L Lc h2 T Q Q0 Q
    maksimal menit maksimal maksimal maksimal maksimal maksimal menit
    mm mm mm mm mm mm mm mm kN/LB kN kg/m
*03C *15 4.7625 2.48 2.38 1.62 6.1 6.9 4.3 0.6 1.80/409 2 0.08
*04C-1 *25 6.35 3.3 3.18 2.31 7.9 8.4 6 0.8 3.50/795 4.6 0.15
*06C-1 *35 9.525 5.08 4.77 3.58 12.4 13.17 9 1.3 7.90/1795 10.8 0.33
085-1 41 12.7 7.77 6.25 3.58 13.75 15 9.91 1.3 6.67/1516 12.6 0.41
08A-1 40 12.7 7.95 7.85 3.96 16.6 17.8 12 1.5 14.10/3205 17.5 0.62
10A-1 50 15.875 10.16 9.4 5.08 20.7 22.2 15.09 2.03 22.20/5045 29.4 1.02
12A-1 60 19.05 11.91 12.57 5.94 25.9 27.7 18 2.42 31.80/7227 41.5 1.5
16A-1 80 25.4 15.88 15.75 7.92 32.7 35 24 3.25 59.70/12886 69.4 2.6
20A-1 100 31.75 19.05 18.9 9.53 40.4 44.7 30 4 88.50/20114 109.2 3.91
24A-1 120 38.1 22.23 25.22 11.1 50.3 54.3 35.7 4.8 127.00/28864 156.3 5.62
28A-1 140 44.45 25.4 25.22 12.7 54.4 59 41 5.6 172.40/39182 212 7.5
32A-1 160 50.8 28.58 31.55 14.27 64.8 69.6 47.8 6.4 226.80/51545 278.9 1.1
36A-1 180 57.15 35.71 35.48 17.46 72.8 78.6 53.6 7.2 280.20/63682 341.8 13.45
40A-1 200 63.5 39.68 37.85 19.85 80.3 87.2 60 8 353.80/80409 431.6 16.15
48A-1 240 76.2 47.63 47.35 23.81 90.5 103 72.39 9.5 51.30/115977 622.5 23.2

 

 DIN/ISO Melempar Rol Lebar Pin Pin Lnner Piring Terakhir Rata-rata berat
KIN/ISO     di antara diameter panjang piring tebal tarik tarik per
Rantai     pelat bagian dalam       kedalaman -ness kekuatan kekuatan meter
TIDAK. P d1 b1 d2 L Lc h2 T Q Q0 Q
  maksimal menit maksimal maksimal maksimal maksimal maksimal menit
  mm mm mm mm mm mm mm mm kN/LB kN kg/m
04B-1 6 4 2.8 1.85 6.8 7.8 5 0.6 3.2/682 3.2 0.11
05B-1 8 5 3 2.31 8.2 8.9 7.1 0.8 5.0/1136 5.9 0.2
*06B-1 9.525 6.35 5.72 3.28 13.15 14.1 8.2 1.3 9.0/2045 10.4 0.41
08B-1 12.7 8.51 7.75 4.45 16.7 18.2 11.8 1.6 18.0/4091 19.4 0.69
10B-1 15.875 10.16 9.65 5.08 19.5 20.9 14.7 1.7 22.4/5091 27.5 0.93
12B-1 19.05 12.07 11.68 5.72 22.5 24.2 16 1.85 29.0/6591 32.2 1.15
16B-1 25.4 15.88 17.02 8.28 36.1 37.4 21 4.15/3.1 60.0/13636 72.8 2.71
20B-1 31.75 19.05 19.56 10.19 41.3 45 26.4 4.5/3.5 95.0/21591 106.7 3.7
24B-1 38.1 25.4 25.4 14.63 53.4 57.8 33.2 6.0/4.8 160.0/36364 178 7.1
28B-1 44.45 27.94 30.99 15.9 65.1 69.5 36.7 7.5/6.0 200.0/45455 222 8.5
32B-1 50.8 29.21 30.99 17.81 66 71 42 7.0/6.0 250.0/56818 277.5 10.25
40B-1 63.5 39.37 38.1 22.89 82.2 89.2 52.96 8.5/8.0 355.0/80682 394 16.35
48B-1 76.2 48.26 45.72 29.24 99.1 107 63.8   560.0/127272 621.6 25

Produk yang ditampilkan
 
 

  
  

    

Our workshop and hot treatment equipment.

  

 

   Pertanyaan yang Sering Diajukan (FAQ)

Q1. What is your terms of packing?
A: Generally, we pack CZPT goods in single color box. If you have special request about packing, pls negotiate with us in CZPT , we can pack the goods as your request.

Q2. What is your terms of payment?
A: Pembayaran T/T 30% sebagai uang muka, dan 70% sebelum pengiriman. Kami akan menunjukkan foto produk dan kemasannya kepada Anda. 
before you pay the balance. CZPT payments terms, pls negotiate with us in CZPT , we can discuss.

Q3. What is your terms of delivery?
A: EXW, FOB, CFR, CIF.

Q4. Bagaimana dengan waktu pengiriman Anda?
A: Generally, it will take 25 to 30 days after receiving your CZPT payment. The specific delivery time depends 
on the items and the quantity of your order.

Q5. Dapatkah Anda memproduksi sesuai dengan sampel?
A: Yes, we can produce by your samples or technical drawings. We can build the molds and fixtures.

Q6. Apa kebijakan sampel Anda?
A: We can supply the sample if we have ready parts in stock, but the CZPT ers have to pay the sample cost and 
the courier cost.We welcome sample order.

Q7. Apakah Anda menguji semua barang Anda sebelum pengiriman?
A: Yes, we have 100% test before delivery

Q8: Bagaimana Anda membangun hubungan bisnis yang baik dan jangka panjang dengan CZPT?
1. We keep good quality and competitive price to ensure CZPT CZPT ers benefit ;
2. Kami menghormati setiap anggota CZPT sebagai teman CZPT dan kami dengan tulus berbisnis dan menjalin persahabatan dengan mereka. 
tidak peduli dari mana mereka berasal.