Kategooriad: Tootekataloog

F Series Parallel Helical Geared Motor Manufacturer From China

F sequence Parallel Shaft-CZPTcal Geared Motor Characteristics

1.Attributes:

  1. Large efficiency: ninety two%-94%
  2. Parallel output, compact framework, big output torque, smooth procedure, lower noise and lengthy services lifestyle.
  3. Substantial precision: the equipment is created of large-top quality alloy metal forging, carbonitriding and hardening therapy, grinding procedure to make certain substantial precision and stable running.
  4. Large interchangeability: highly modular, serial layout, robust versatility and interchangeability.

two. CZPT parameters

Suhe 3.77-276.seventy seven
Input electrical power .12-200KW
Output torque three.five-21700N.m
Output velocity 5-352rpm
Paigaldusvõimalused Foot mounted, foot mounted with sound shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm.
Input Strategy Flange input(AM), shaft enter(Advertisement), inline AC motor input, or AQA servo motor
Brake Release HF-handbook launch(lock in the brake release place), HR-handbook release(autom-atic braking placement)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor protection Bimetal swotch)
Mounting Situation M1, M2, M3, M4, M5, M6
Sorteeri F37-F157
Output shaft dis. 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing content HT200 higher-toughness cast iron from R37,forty seven,fifty seven,sixty seven,77,87
Housing substance HT250 Higher power forged iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening therapy
Jõudlus 92%-94%
Lubricant VG220
Defense Course IP55, F class

CZPTshine Travel

ZheJiang CZPTshine Drive Co.,Ltd,the predecessor was a point out-owned military mould enterprise, was set up in 1965. CZPTshine specializes in the full electricity transmission answer for higher-conclude gear production industries dependent on the intention of “Platform Product, Software Design and style and Expert Provider”.
CZPTshine have a strong technical pressure with above 350 employees at current, like more than thirty engineering technicians, thirty high quality inspectors, covering an spot of 80000 sq. meters and varieties of advanced processing machines and testing equipments. We have a great basis for the business application development and services of high-finish pace reducers & variators proudly owning to the provincial engineering technology study heart,the lab of gear pace reducers, and the foundation of contemporary R&D.

Our Group

Top quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

seven. Certification.
All our merchandise get ISO & CE & UL certification.

Pakkimine

Kohaletoimetamine

 

episood

Jaga
Avaldanud
episood

Hiljutised postitused

Milline on parim mootorrattakett? — Ostja juhend sõidustiili järgi

Ostja juhend Milline on parim mootorratta kett? Ostja juhend sõidutüübi järgi Parim…

3 kuud tagasi

Mootorratta keti vahetamine – samm-sammult juhend

Kuidas-teha – keti vahetamine Kuidas vahetada mootorratta ketti Samm-sammult juhend Mootorratta kett…

3 kuud tagasi

Mootorratta keti kulumise mõõtmine – täielik meetod

Juhend – keti kulumise mõõtmine Kuidas mõõta mootorratta keti kulumist Täielik meetod…

3 kuud tagasi

Kuidas mootorratta ketti määrida – samm-sammult juhend

Hooldusjuhend – keti määrimine Kuidas määrida mootorratta ketti Samm-sammult juhend Õige…

3 kuud tagasi

Mootorratta kett venib pidevalt – põhjused ja lahendused

Probleemide lahendamise juhend Mootorratta kett venib pidevalt Põhjused ja lahendused Kett, mis vajab iga…

3 kuud tagasi

Mootorratta keti pinge reguleerimine – samm-sammult juhend

Kasutusjuhend – keti pinge Kuidas reguleerida mootorratta keti pinget Samm-sammult juhend Keti pinge…

3 kuud tagasi