Kategori: Katalog Produk

Omeik Jet Water Pump Motors

Aplikasi:

>> Developed for the pool pump, bathtub pump, centrifugal pump
>> Be created of seleceted quality material, latest layout in entirety
>> Excellent overall performance, minimal sounds, tiny vibration, secure and reputable coopeation
>> Good appreance, light-weight bodyweight
>> Be taken care of extremely convenienty, easy constuction. 

Running Circumstances:
one. Ambient temperature: -fifteen degree Celsius≤ θ ≤ 40degree Celsius
two. Altitude: ≤ 1000m
3. Rated voltage: 220V
four. Rated frequency: 50Hz/60Hz
five. Responsibility: Constant(S1)
six. Insulation course: Class B/F
7. Security course: IP44/IP54/IP55
eight. Cooling technique: IC0141

Observe: If you have any particular specifications, you should get in touch with us.

Desain Keluaran Terkini Energi Eff Kecepatan Tstart/Tn Ist/In Tmax/Tn
KW HP (A) Element (%) (r/min)
FT63-one hundred eighty .18 one/4 1.33 .93 enam puluh enam 2800 .lima 4 satu.8
FT63-250 dua puluh lima one/3 1.82 0,93 67 2800 .5 4 1.8
FT63-370 .37 1/2 2.62 0,93 69 2800 .forty five empat 1.8
FT63-550 .55 3/empat three.79 .93 71 2800 .forty five 4 satu.8
FT71-550 .55 three/four three.79 .93 71 2800 .forty five empat 1.8
FT71-750 .75 satu 5.02 0,93 tujuh puluh tiga 2800 .4 empat 1.8
SD63-a hundred and eighty .18 1/four two.62/one.31 0,93 enam puluh tujuh 3450 .5 empat satu.8
SD63-250 .25 one/three 3.6/one.8 0,93 68 3450 .5 empat 1.8
SD63-370 .37 one/two 5.sixteen/two.fifty eight 0,93 70 3450 .45 empat 1.8
SD63-550 lima puluh lima three/four 7.46/three.seventy three 0,93 tujuh puluh dua 3450 .forty five 4 1.8
SD71-550 .55 three/4 7.66/3.eighty three 0,93 tujuh puluh dua 3450 .forty five 4 satu delapan
SD71-750 tujuh puluh lima satu nine.9/4.ninety five .93 74 3450 empat empat 1.8
SD80-1100 1.satu satu.lima fourteen.fourteen/7.07 0,93 76 3450 empat 4 satu delapan
SD80-1500 1.lima 2 19.04/nine.52 0,93 seventy seven 3450 .35 lima satu.8

SPARE Parts:

PACKING Ways

Pertanyaan yang Sering Diajukan (FAQ)

T: Apakah Anda menyediakan layanan OEM?
A: Of course

Q: What is your payment term?

A: 30% T/T in progress, 70% harmony when getting B/L copy.  Or irrevocable L/C.

Q: What is your direct time?

A: About thirty times following acquiring deposit or original L/C.

Q: What certifiicates do you have?

A: We have CE, ISO. And we can implement the other people you require.

 

ep

Membagikan
Diterbitkan oleh
ep

Pos Terbaru

Rantai Motor Terbaik Apa? — Panduan Membeli Berdasarkan Jenis Berkendara

Panduan Membeli Rantai Motor Terbaik Apa Saja? Panduan Membeli Berdasarkan Jenis Berkendara Yang terbaik…

3 bulan yang lalu

Cara Mengganti Rantai Sepeda Motor — Panduan Langkah demi Langkah

Panduan Cara Mengganti Rantai Sepeda Motor: Panduan Langkah demi Langkah. Rantai sepeda motor…

3 bulan yang lalu

Cara Mengukur Keausan Rantai Sepeda Motor — Metode Lengkap

Panduan Cara Mengukur Keausan Rantai — Cara Mengukur Keausan Rantai Sepeda Motor Metode Lengkap…

3 bulan yang lalu

Cara Melumasi Rantai Sepeda Motor — Panduan Langkah demi Langkah

Panduan Perawatan — Pelumasan Rantai Cara Melumasi Rantai Sepeda Motor Panduan Langkah demi Langkah Yang benar…

3 bulan yang lalu

Rantai Motor Terus Meregang — Penyebab dan Solusinya

Panduan Pemecahan Masalah Rantai Motor yang Terus Melar: Penyebab dan Solusi Rantai yang perlu disetel setiap…

3 bulan yang lalu

Cara Menyesuaikan Ketegangan Rantai Sepeda Motor — Panduan Langkah demi Langkah

Panduan Cara Menyetel Ketegangan Rantai — Cara Menyesuaikan Ketegangan Rantai Sepeda Motor Panduan Langkah demi Langkah Ketegangan rantai…

3 bulan yang lalu