Kategori: Katalog Produk

F Series Parallel Helical Geared Motor Manufacturer From China

F sequence Parallel Shaft-CZPTcal Geared Motor Characteristics

1.Attributes:

  1. Large efficiency: ninety two%-94%
  2. Parallel output, compact framework, big output torque, smooth procedure, lower noise and lengthy services lifestyle.
  3. Substantial precision: the equipment is created of large-top quality alloy metal forging, carbonitriding and hardening therapy, grinding procedure to make certain substantial precision and stable running.
  4. Large interchangeability: highly modular, serial layout, robust versatility and interchangeability.

two. CZPT parameters

Perbandingan 3.77-276.seventy seven
Input electrical power .12-200KW
Output torque three.five-21700N.m
Output velocity 5-352rpm
Variasi pemasangan Foot mounted, foot mounted with sound shaft, output flange mounted, hollow shaft mounted, B5 flange mounted with hollow shaft, foot mounted with hollow shaft, B14 flange mounted with hollow shaft, foot mounted with splined hole, foot mounted with shrink disk, hollow shaft mounted with anti-torque arm.
Input Strategy Flange input(AM), shaft enter(Advertisement), inline AC motor input, or AQA servo motor
Brake Release HF-handbook launch(lock in the brake release place), HR-handbook release(autom-atic braking placement)
Thermistor TF(Thermistor defense PTC thermisto)
TH(Thermistor protection Bimetal swotch)
Mounting Situation M1, M2, M3, M4, M5, M6
Menyortir F37-F157
Output shaft dis. 25mm, 30mm, 35mm, 40mm, 50mm, 60mm, 70mm, 90mm, 110mm, 120mm
Housing content HT200 higher-toughness cast iron from R37,forty seven,fifty seven,sixty seven,77,87
Housing substance HT250 Higher power forged iron from R97 107,137,147,
157,167,187
Heat treatment technology carbonitriding and hardening therapy
Pertunjukan 92%-94%
Lubricant VG220
Defense Course IP55, F class

CZPTshine Travel

ZheJiang CZPTshine Drive Co.,Ltd,the predecessor was a point out-owned military mould enterprise, was set up in 1965. CZPTshine specializes in the full electricity transmission answer for higher-conclude gear production industries dependent on the intention of “Platform Product, Software Design and style and Expert Provider”.
CZPTshine have a strong technical pressure with above 350 employees at current, like more than thirty engineering technicians, thirty high quality inspectors, covering an spot of 80000 sq. meters and varieties of advanced processing machines and testing equipments. We have a great basis for the business application development and services of high-finish pace reducers & variators proudly owning to the provincial engineering technology study heart,the lab of gear pace reducers, and the foundation of contemporary R&D.

Our Group

Top quality Handle
Top quality:Insist on Improvement,Strive for Excellence With the development of equipment manufacturing indurstry,customer never satirsfy with the current quality of our products,on the contrary,wcreate the value of quality.
Quality policy:to enhance the overall level in the field of power transmission  
Quality View:Continuous Improvement , pursuit of excellence
Quality Philosophy:Quality creates value

three. Incoming Quality Control
To establish the AQL acceptable level of incoming material control, to provide the material for the whole inspection, sampling, immunity. On the acceptance of qualified products to warehousing, substandard goods to take return, check, rework, rework inspection responsible for tracking bad, to monitor the supplier to take corrective 
measures to prevent recurrence.

4. Process Quality Control
The manufacturing site of the first examination, inspection and final inspection, sampling according to the requirements of some projects, judging the quality change trend
 found abnormal phenomenon of manufacturing, and supervise the production department to improve, eliminate the abnormal phenomenon or state.

five. FQC(Final QC)
After the manufacturing department will complete the product, stand in the customer’s position on the finished product quality verification, in order to ensure the quality of 
customer expectations and needs.

6. OQC(Outgoing QC)
After the product sample inspection to determine the qualified, allowing storage, but when the finished product from the warehouse before the formal delivery of the goods, there is a check, this is called the shipment inspection.Check content:In the warehouse storage and transfer status to confirm, while confirming the delivery of the 
product is a product inspection to determine the qualified products.

seven. Certification.
All our merchandise get ISO & CE & UL certification.

Sedang mengemas

Pengiriman

 

ep

Membagikan
Diterbitkan oleh
ep

Pos Terbaru

Rantai Motor Terbaik Apa? — Panduan Membeli Berdasarkan Jenis Berkendara

Panduan Membeli Rantai Motor Terbaik Apa Saja? Panduan Membeli Berdasarkan Jenis Berkendara Yang terbaik…

3 bulan yang lalu

Cara Mengganti Rantai Sepeda Motor — Panduan Langkah demi Langkah

Panduan Cara Mengganti Rantai Sepeda Motor: Panduan Langkah demi Langkah. Rantai sepeda motor…

3 bulan yang lalu

Cara Mengukur Keausan Rantai Sepeda Motor — Metode Lengkap

Panduan Cara Mengukur Keausan Rantai — Cara Mengukur Keausan Rantai Sepeda Motor Metode Lengkap…

3 bulan yang lalu

Cara Melumasi Rantai Sepeda Motor — Panduan Langkah demi Langkah

Panduan Perawatan — Pelumasan Rantai Cara Melumasi Rantai Sepeda Motor Panduan Langkah demi Langkah Yang benar…

3 bulan yang lalu

Rantai Motor Terus Meregang — Penyebab dan Solusinya

Panduan Pemecahan Masalah Rantai Motor yang Terus Melar: Penyebab dan Solusi Rantai yang perlu disetel setiap…

3 bulan yang lalu

Cara Menyesuaikan Ketegangan Rantai Sepeda Motor — Panduan Langkah demi Langkah

Panduan Cara Menyetel Ketegangan Rantai — Cara Menyesuaikan Ketegangan Rantai Sepeda Motor Panduan Langkah demi Langkah Ketegangan rantai…

3 bulan yang lalu