Kategori: Katalog Produk

780 Galvanized Corrugated Roofing Sheet Making Machine Manual Roof Tile Zinc Making Machine

Description of 780 galvanized corrugated roofing sheet creating machine handbook roof tile zinc creating device

   The comprehensive corrugated roofing sheet creating device line consists of de-coiler, principal machine, personal computer managing program and run out tables. Our devices are geared up with a computer controlling program. We simply program the pieces and length we need in the laptop and the wave panel equipment generates it automatically. The machines are straightforward to operate and operating secure.  

Equivalent equipment perhaps u like:

 

Doing work approach

     The full line consists of decoiler, forming equipment, personal computer controlling program and run out tables. Our devices are geared up with a pc controlling method to hold products correct.

Primary parameters

TIDAK

            Jenis

Spesifikasi

1

Raw substance Variasi PPGI
Feeding width 1000 mm
Ketebalan .three-.eight mm

2

Decoiler Operation Guide
Bodyweight apacity five Tons

tiga

Main body Roller station 22 row
Diameter of shaft 75 mm
Shaft materials 45# with .05mm chrome
Roller material forty five# with .05mm chrome
Baik Chinese kind
Body 300mm C-beam
Body thickness 16 mm
Bahan Cr twelve
Prosedur CZPT computerized
Functioning velocity 8-twelve m/min

empat

Energi Driving way Chain 1 inch
Main motor five.five KW
Voltase 380V/50HZ, 3 phase

lima

Manage box CZPT box PLC handle technique, inventer
PLC brand name Delta produced in ZheJiang
Inverter brand Delta manufactured in ZheJiang
Language Chinese and English

Guide decoiler
It is passive sort could load coil by expend the blots correct at coil inner diameter. It is easy to function and affordable remedy. 
Xihu (West Lake) Dis. unit
Undertake guiding bar and sliding block to control the width and position of the metal sheet. The coil is guided in the proper place and handed to the roll forming program. Can alter the guiding bar with loosing the correcting bolts to feed sheet in appropriate placement. It is mounted construction to make positive can not move effortlessly. 
Roll Forming Method: 
Roll forming program consist of machine body, transmission program, electrical motor and roll forming method. 
A. Machine body adopts welding structure with shot blasting and painting remedy
B. All rollers substance undertake large top quality No. forty five steel, with hard chrome coated on surface area, all remedy by full CNC machines, to make confident the rollers with very good rigidity and precision, and sort excellent roofing sheet as for each design and style. 
C. All rolling shafts are made by substantial high quality No. forty five metal with quench and temper treatment, so the shafts with good rigidity which could use for prolonged tern CZPT deformation. 
D. Rolling shafting supporting composition sort is metal wall and welded with the basement collectively to have rigidity. 
E. Cycloidal pin gear velocity reducer motor driven, the back again/CZPT roller driven by chain, portion of higher/reduced rollers pushed by gear
F. Change the screw bar manually to modify the length in between higher/reduced rollers for variation thickness of sheet. 
(Focus: all rolling technique has altered in our company as a perfect circumstance, we do not recommend to alter the rollers at random, if necessary, must modify by a experienced technician or soon after teach by our engineer. Otherwise will lead to the device can not form a good profile
Slicing device
A. Adopts post reducing, the cutting blade substance is Cr12 with quenched remedy, right after cutting, there is no content squandered. 
B. Adopts welded body for great rigidity. 
C. The chopping action is droved by the power from hydraulic station which assures the procession of the cutting and reduced noisy, long daily life. 
CZPT Method
It is managed by equipment wheel oil pump. Soon after filling the hydraulic oil into the hydraulic oil tank, the pumps drive the cutter machine to begin the chopping occupation. 
The method consists of a set of hydraulic tank, a set of hydraulic oil pump, two hydraulic pipes. And two sets of electromagnetism valves. 
Electrical power of the oil pump: 3kw
CZPT oil: forty#
PLC control technique 
It adopts industrial computer to control. The target piece’s duration is adjustable and digit of it can be altered. Computed method has two modes: automated and handbook one particular. The technique is easy to function and use. 
Processing precision: in 1.00mm
It is made up of liquid crystal display, programmer, transformer for the electronic devices and kits of every single portion. Contact monitor
PLC is ZheJiang Panasonic
Transducer model is ZheJiang  Delta
The vendor must offer Chinese and English language screen
Counter
One particular counter gauges length, pulses, and decides size. 

Perform steps

To verify device movie or a lot more confuse, speak to with me

We equipment promote to heaps of nations around the world

Sertifikasi kami

Business data

   CZPT group is a specialist company designing and making roll forming equipment proven in June 1996. We have 4 factories doing work in ZheJiang , ZheJiang and ZheJiang province. More than four hundred workers provide service for u.
     Products mainly incorporate trapezoidal metal roof/wall panel device, C&Z condition purline machine, highway guardrail device, sandwich panel creation line, deck forming machine, C U L light keel device, shutter slat doorway forming equipment, chopping machine, downpipe device, gutter equipment, and so forth.

How to check out us?

Our provider

one. Free specialized assistance and free of charge add-ons supply.

2. Engineer CZPT to provider equipment abroad.

3. One year guarantee is provided.

four. Long existence specialized direction for totally free.

5. We often offer you specialized support, swift reaction, all your inquire will be replied in 24 several hours.
 

Issue & Solution

1. Q: How to visit our company:

     A: Fly to ZheJiang  Airport: By fast train From ZheJiang South station to HangCZPT west station

(1hour), then we can pick up you to manufacturing facility(40min).

     B: Fly to ZheJiang  Airport: By fast train From ZheJiang  Xihu (West Lake) Dis.ao station  to HangCZPT west    

station(4.5 hours), then we can pick up you to manufacturing facility(40min).

2.  Q: What ought to I give if I want to CZPT equipment?

     A: U need supply profile drawing, content, thickness, voltage and your special requirements.

three.  Q: What is the Warranty?

     A: Within twelve mounts, all technicals are all set to serve you at any time.

4.  Q: What can you do if the machine damaged?

     A: Our machine’s warranty interval is 12 months, if the broken elements can not repair, we will send

new parts change the broken areas free of charge, but you require pay out the convey value if after warranty period of time. we can negotiate to remedy the problem, and we source the complex support for whole life of products.

five.  Q: If need technician to workshop to debug and instruct, how to do?

     A: We sent technician to your region to repair the equipment. Buyer must bear expense including: visa, spherical vacation ticket and suited lodging, also buyer need to pay the salary 100 USD/day.

 

ep

Membagikan
Diterbitkan oleh
ep

Pos Terbaru

Rantai Motor Terbaik Apa? — Panduan Membeli Berdasarkan Jenis Berkendara

Panduan Membeli Rantai Motor Terbaik Apa Saja? Panduan Membeli Berdasarkan Jenis Berkendara Yang terbaik…

4 bulan ago

Cara Mengganti Rantai Sepeda Motor — Panduan Langkah demi Langkah

Panduan Cara Mengganti Rantai Sepeda Motor: Panduan Langkah demi Langkah. Rantai sepeda motor…

4 bulan ago

Cara Mengukur Keausan Rantai Sepeda Motor — Metode Lengkap

Panduan Cara Mengukur Keausan Rantai — Cara Mengukur Keausan Rantai Sepeda Motor Metode Lengkap…

4 bulan ago

Cara Melumasi Rantai Sepeda Motor — Panduan Langkah demi Langkah

Panduan Perawatan — Pelumasan Rantai Cara Melumasi Rantai Sepeda Motor Panduan Langkah demi Langkah Yang benar…

4 bulan ago

Rantai Motor Terus Meregang — Penyebab dan Solusinya

Panduan Pemecahan Masalah Rantai Motor yang Terus Melar: Penyebab dan Solusi Rantai yang perlu disetel setiap…

4 bulan ago

Cara Menyesuaikan Ketegangan Rantai Sepeda Motor — Panduan Langkah demi Langkah

Panduan Cara Menyetel Ketegangan Rantai — Cara Menyesuaikan Ketegangan Rantai Sepeda Motor Panduan Langkah demi Langkah Ketegangan rantai…

4 bulan ago