Kategorier: Produktkatalog

110V 220V High Performance AC Shade Pole Gear Motor

Description of the creation

Suit for remotr monitor manage, distant curtain, electrical soldering, water meter, BBQ, oven, washing equipment, rubbish machines, house appliances, slot machine, cash discover equipment, auto equipment.

Geared motor torque/speed
 

Reduktionsforhold one:251 one:389 one:590 1:722 1:897 one:1269 1:1601 one:1929 one:2708 one:3385 one:5078
Number of equipment trans 4 5
seks
Rated pace(rpm) at 60Hz eleven.one 7.one 4.seven 3.8 3.en to.to en.7 en.4 1. .8 .5
YJ61-PAG70120
L=16(kgf.cm)
Nominelt drejningsmoment
22.8 35.4 53.seven 65.7 eighty one.six 104 132 159 200 200 200
YJ61-PAG70120
L=26(kgf.cm)
Nominelt drejningsmoment
35. ni fifty five.six 84.4 103 128 164 to hundrede to hundrede to hundrede 200 to hundrede
YJ61-PAG70120
L=thirty(kgf.cm)
Nominelt drejningsmoment
45.seven 70.8 107 131 163 200 200 to hundrede 200 to hundrede 200
YJ61-PAG70120
L=35(kgf.cm)
Nominelt drejningsmoment
fifty seven.1 88.5 134 164 200 200 200 to hundrede 200 to hundrede to hundrede
YJ61-PAG70120
L=forty(kgf.cm)
Nominelt drejningsmoment
sixty five.5 a hundred and one 153 187 to hundrede 200 200 to hundrede 200 200 200

to generationers strøm

 
 In current ten many years, Derry has been committed to the manufacture of the motor goods and the primary goods can be labeled into the adhering to sequence, specifically DC motor, DC equipment motor, AC motor, AC equipment motor, Stepper motor, Stepper equipment motor, Servo motor and CZPT actuator collection. 

Our motor products are widely applied in the fields of aerospace business, automotive market, economic gear, family appliance, industrial automation and robotics, health care products, office equipment, packing equipment and transmission business, providing buyers reputable customized options for driving and controlling.

4.Our Services
one). CZPT Provider:

Swift Reply All enquiry or email be replied in 12 hrs, no delay for your organization.
Skilled Staff Concerns about merchandise will be replied skillfully, specifically, greatest tips to you.
Begrænset direkte tid Sample or small order sent in 7-15 times, bulk or CZPT purchase about thirty days.
Payment Decision T/T, Western Union,, L/C, and so forth, easy for your enterprise.
Just before cargo Just take photographs, send out to buyers for affirmation. Only verified, can be transported out.
Sprogvalg In addition to English, you can use your possess language by e-mail, then we can translate it.

2). CZPTization Support:
Motor specification(no-load pace , voltage, torque , diameter, sounds, lifestyle, testing) and shaft duration can be tailor-created according to customer’s specifications.

5.Bundle & Shipping

six.Make contact with Info
Rachel Ye
————————————-  

HangCZPT Derry E&M Tech. Co., Ltd.
 
 
 
 
 
 

afsnit

Dele
Udgivet af
afsnit

Seneste indlæg

Hvad er den bedste motorcykelkæde? — Købsguide efter køretype

Købsguide Hvad er den bedste motorcykelkæde? Købsguide efter køretype Den bedste…

for 3 måneder siden

Sådan udskifter du en motorcykelkæde — trin-for-trin guide

Vejledning — Udskiftning af kæde Sådan udskifter du en motorcykelkæde Trin-for-trin-vejledning Motorcykelkæde…

for 3 måneder siden

Sådan måler du motorcykelkædeslid – den komplette metode

Vejledning — Måling af kædeslid Sådan måler du motorcykelkædeslid Den komplette metode…

for 3 måneder siden

Sådan smører du en motorcykelkæde — trin-for-trin guide

Vedligeholdelsesvejledning — Kædesmøring Sådan smører du en motorcykelkæde Trin-for-trin-vejledning Den korrekte…

for 3 måneder siden

Motorcykelkæden bliver ved med at strække sig – årsager og løsninger

Problemløsningsguide Motorcykelkæde bliver ved med at strække sig Årsager og løsninger En kæde, der skal justeres hver…

for 3 måneder siden

Sådan justerer du motorcykelkædespændingen — trin-for-trin guide

Vejledning — Kædespænding Sådan justerer du motorcykelkædespænding Trin-for-trin-vejledning Kædespænding…

for 3 måneder siden