{"id":1051,"date":"2020-11-22T13:07:47","date_gmt":"2020-11-22T13:07:47","guid":{"rendered":"https:\/\/motorcyclechain.top\/63355mm-di-diibt4-ybx3-series-high-efficiency-explosion-proof-three-phase-induction-electric-motor\/"},"modified":"2020-11-22T13:07:47","modified_gmt":"2020-11-22T13:07:47","slug":"63355mm-di-diibt4-ybx3-series-high-efficiency-explosion-proof-three-phase-induction-electric-motor","status":"publish","type":"post","link":"https:\/\/motorcyclechain.top\/es\/63355mm-di-diibt4-ybx3-series-high-efficiency-explosion-proof-three-phase-induction-electric-motor\/","title":{"rendered":"63~355mm Di Diibt4 Ybx3 Series High Efficiency Explosion-Proof Three Phase Induction Electric Motor"},"content":{"rendered":"

\"63~355mm<\/p>\n

WHY\u00a0 CHOOSE\u00a0 US\u00a0 ?<\/strong>
1.We are professional\u00a0 electrical motor manufacture for\u00a0 thirty several years considering that 1988.
2.We have very best top quality components to make our electric powered motors greatest overall performance.\u00a0
three.Our merchandise are one hundred% brand new , one hundred% cooper wire , 100% output.
four.We have innovative test device to make the one hundred% competent items for our buyers.
5.We have innovative winding , portray, assembly and packing etc. production line which make our products great visual appeal, great performance and properly packaged.
6.We have superior and automatic devices these kinds of as higher pace punching devices, swing punching devices, equipment to kind the rotors ,stators etc. in one piece, automatic packing equipment which can generate great appearance and great functionality motors even though lessen the labor cost and mechanical reduction .
7.We have specialist fiscal office who are excellent at calculating and managing the cost and money procedure which could make most favorable charges for our consumers.<\/p>\n

Introducci\u00f3n a la organizaci\u00f3n<\/strong><\/p>\n

DAJI Team. ZHangCZPTG DAGAO CZPT MOTOR Co., Ltd, is specialist enaged in electric motor production for thirty several years given that 1988. The headquarters is situated in ZheJiang town, team with four producing bases in zHangCZPTg and ZheJiang , has much more than three hundred national revenue centers and unique companies, and exported to much more than 50 countries and locations.<\/p>\n

Proceso de dar un t\u00edtulo<\/p>\n

Product Introduction<\/strong><\/p>\n

This\u00a0series\u00a0explosion-proof\u00a0electric\u00a0motor\u00a0is\u00a0the\u00a0basic\u00a0series\u00a0of\u00a0our\u00a0products\u00a0with\u00a0whole\u00a0closed\u00a0,\u00a0fan\u00a0cool\u00a0and\u00a0squirrel\u00a0cage\u00a0high\u00a0efficiency.Thepower\u00a0class\u00a0and\u00a0measurements\u00a0are\u00a0in\u00a0accordance\u00a0with\u00a0IEC\u00a0standards\u00a0,the\u00a0explosion-proof\u00a0performance\u00a0is\u00a0in\u00a0accordance\u00a0with\u00a0GB3836.1\u00a0and\u00a0GB3836.two.It\u00a0can\u00a0be\u00a0used\u00a0in\u00a0the\u00a0place\u00a0where\u00a0exists\u00a0explosive\u00a0gas\u00a0mixture.
\u00a0<\/p>\n\n\n\n\n\n\n\n\n\n\n\n\n\n\n
\u00a0 \u00a0 \u00a0 YBX3 Sequence Substantial Efficiency Explosion-Evidence 3-Period Asynchronous Motor<\/strong><\/td>\n<\/tr>\n
1). Frame:<\/td>\n63 – 355 mm<\/td>\n<\/tr>\n
2). Electricity:<\/td>\n.12 – 315 kW<\/td>\n<\/tr>\n
three). Voltage:<\/td>\n380V, 660V, 1140V, 380V\/660V, 660V\/1140V<\/td>\n<\/tr>\n
four). Frequency:<\/td>\nfifty Hz<\/td>\n<\/tr>\n
5). Shell:<\/td>\nsolid iron human body, aluminum human body<\/td>\n<\/tr>\n
6). Pole:<\/td>\n2, four, 6, 8, ten<\/td>\n<\/tr>\n
seven). Security degree:<\/td>\nIP55<\/td>\n<\/tr>\n
8). Insulation class:<\/td>\nF<\/td>\n<\/tr>\n
nine). Cooling approach:<\/td>\nIC411<\/td>\n<\/tr>\n
ten). Obligation Kind:<\/td>\nS1<\/td>\n<\/tr>\n
11).Certificates:<\/td>\nCE, CCC, CZPT, SGS and so on<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

Doing work Condition:\u00a0<\/strong>ambient temperature is -fifteeno<\/sup>C to 35o<\/sup>C (mine) or fortyo<\/sup>C\u00a0(manufacturing facility), and under one thousand meters earlier mentioned sea degree<\/p>\n

Mounting Type:<\/strong>
Conventional mounting sort and suited frame measurement are provided in adhering to desk(with\u00a0“\u221a”)<\/p>\n\n\n\n\n\n\n\n\n\n
Marco<\/td>\nSimple Type<\/td>\nDerived Sort<\/td>\n<\/tr>\n
B3<\/td>\nB5<\/td>\nB6<\/td>\nB7<\/td>\nB8<\/td>\nB14<\/td>\nB34<\/td>\nB35<\/td>\nV1<\/td>\nV3<\/td>\nV5<\/td>\nV6<\/td>\nV15<\/td>\nV18<\/td>\nV35<\/td>\nV36<\/td>\nV37<\/td>\n<\/tr>\n
63~71<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n–<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n–<\/td>\n\u221a<\/td>\n–<\/td>\n–<\/td>\n\u00a0<\/td>\n<\/tr>\n
eighty~112<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n–<\/td>\n\u221a<\/td>\n<\/tr>\n
132~160<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n–<\/td>\n–<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n\u221a<\/td>\n–<\/td>\n\u221a<\/td>\n–<\/td>\n\u221a<\/td>\n<\/tr>\n
180~280<\/td>\n\u221a<\/td>\n\u221a<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n\u221a<\/td>\n\u221a<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n<\/tr>\n
315~355<\/td>\n\u221a<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n\u221a<\/td>\n\u221a<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n–<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

Terminal Box Structure:<\/strong>
The moter terminal box has outstanding explosion-proof structure performance and high protection quality, and has a massive cavity for wiring. The incoming line is divided into two sorts of construction: rubber sheath cable and steel pipe wiring.\u00a0It can be made 1 inlet entrance or two inlet entrance respectively in accordance with the needs of distinct beginning sort.
\u00a0<\/p>\n\n\n\n\n\n\n\n\n\n\n\n\n
Marco<\/td>\nQuantity of Entrance<\/td>\nThe Max Outer Diameter of Inlet Cable<\/td>\nThread of Conduit Entry<\/td>\n<\/tr>\n
63~seventy one<\/td>\nuno<\/td>\n\u03a620<\/td>\nM30*2<\/td>\n<\/tr>\n
80~one hundred<\/td>\nuno<\/td>\n\u03a625<\/td>\nM30*two<\/td>\n<\/tr>\n
112~132<\/td>\n<\/tr>\n
one hundred sixty~a hundred and eighty<\/td>\nuno<\/td>\n\u03a635<\/td>\nM36*two<\/td>\n<\/tr>\n
200~225<\/td>\n1<\/td>\n\u03a642<\/td>\nM48*two<\/td>\n<\/tr>\n
250~280<\/td>\none particular<\/td>\n\u03a650<\/td>\nM64*two<\/td>\n<\/tr>\n
250~280<\/td>\ndos<\/td>\n\u03a642<\/td>\nM48*two<\/td>\n<\/tr>\n
315~355<\/td>\ndos<\/td>\n\u03a650<\/td>\nM64*2<\/td>\n<\/tr>\n
315~355<\/td>\none particular<\/td>\n\u03a664<\/td>\nM72*2<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n

Manufacturing unit Rewards<\/strong><\/p>\n

1. 30 several years historical past
2.\u00a0Competitive price tag
three.\u00a0Guaranteed quality\u00a0
4.\u00a0Fast shipping time: normal\u00a0models\u00a0about\u00a015-20 days\u00a0, uncommon models about\u00a030 days
five.\u00a0100%\u00a0testing\u00a0after\u00a0every approach, 100%\u00a0raw\u00a0materials are selective\u00a0
6.\u00a0High efficiency\u00a0
seven.\u00a0Low noise\u00a0\u00a0
8.\u00a0Long daily life
nine.\u00a0Power conserving
ten.\u00a0Slight vibration
eleven.\u00a0It\u00a0is\u00a0newly\u00a0designed\u00a0in\u00a0conformity\u00a0with\u00a0the\u00a0relevant\u00a0rules\u00a0of\u00a0IEC\u00a0standards
twelve.\u00a0Professional\u00a0Service
13.\u00a0Warranty:\u00a012\u00a0months\u00a0from\u00a0date\u00a0of\u00a0delivery
14.\u00a0Main\u00a0Market:\u00a0South\u00a0America,\u00a0CZPTpe,\u00a0Middle\u00a0East,\u00a0Southest\u00a0Asia,\u00a0Africa\u00a0and\u00a0so\u00a0on\u00a0\u00a0
fifteen.\u00a0We\u00a0have certificates for\u00a0CE,\u00a0CCC,\u00a0CZPT, SGS and so on<\/p>\n

Nuestros servicios<\/strong>\u00a0<\/p>\n

one. We valuing each customer.
2. We cooperate with consumer to design and develop new merchandise. Offer OEM.
three. twenty five-thirty days top time.
four. We would like to support you arranging supply factors, test factors or others on your request.<\/p>\n

Preguntas frecuentes<\/strong><\/strong><\/p>\n

Q:\u00a0What\u00a0is\u00a0your\u00a0delivery time?
A:\u00a0Within\u00a020-25 days\u00a0after\u00a0receiving\u00a0deposit.\u00a0<\/p>\n

Q:\u00a0Do\u00a0you\u00a0offer\u00a0OEM\u00a0service?
A:\u00a0Yes.\u00a0We accept OEM support.\u00a0<\/p>\n

Q: What is your MOQ of this merchandise ?
A: 10\u00a0PCS for each item.\u00a0\u00a0\u00a0<\/p>\n

Q: Can we sort our model on it?
A: Yes, of program.<\/p>\n

Q: The place is your loading port ?
A: HangCZPT Port, ZheJiang Port, China.<\/p>\n

Q: What is your production capacity?
A: About a thousand PCS for each day.<\/p>\n

Buying Instructions<\/strong><\/p>\n

1. You should indicate the fram dimension, power, synchronous speed, voltage, frequency, install measurements, inlet cable entrance type and path of rotation and so forth.<\/p>\n

2. If have particular request, this sort of as the voltage, frequency, safety diploma, duplex shaft, path of rotation, temperature checking device, set up measurements, bearing oil discharge device and so on, remember to point out in particulars in the ordering deal and sign technical agreement if needed.<\/p>\n

three. When buying other collection of motor and derived motor in the sample, remember to follow this instruction CZPT additional notice, thank you for your cooperation! <\/p>\n

\n

\"63~355mm<\/p>","protected":false},"excerpt":{"rendered":"

WHY\u00a0 CHOOSE\u00a0 US\u00a0 ?1.We are professional\u00a0 electrical motor manufacture for\u00a0 thirty several years considering that 1988.2.We have very best top quality components to make our electric powered motors greatest overall performance.\u00a0three.Our merchandise are one hundred% brand new , one hundred% cooper wire , 100% output.four.We have innovative test device to make the one hundred% competent […]<\/p>","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"categories":[1],"tags":[],"class_list":["post-1051","post","type-post","status-publish","format-standard","hentry","category-product-catalog"],"_links":{"self":[{"href":"https:\/\/motorcyclechain.top\/es\/wp-json\/wp\/v2\/posts\/1051","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/motorcyclechain.top\/es\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/motorcyclechain.top\/es\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/motorcyclechain.top\/es\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/motorcyclechain.top\/es\/wp-json\/wp\/v2\/comments?post=1051"}],"version-history":[{"count":0,"href":"https:\/\/motorcyclechain.top\/es\/wp-json\/wp\/v2\/posts\/1051\/revisions"}],"wp:attachment":[{"href":"https:\/\/motorcyclechain.top\/es\/wp-json\/wp\/v2\/media?parent=1051"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/motorcyclechain.top\/es\/wp-json\/wp\/v2\/categories?post=1051"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/motorcyclechain.top\/es\/wp-json\/wp\/v2\/tags?post=1051"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}